AlDC Integrated Microgrid Solution
Why struggle with compute-power synergy when your AIDC can be fully operational today?
Gas Turbine Gensets + Hybrid Energy Storage + SST (Solid State Transformer)
Addressing AIDC Data Center Challenges
Power
Constraints
Keep your AI expansion on schedule
Free Proposal Access
Extended
Deployment Cycles
Power your compute—without waiting for the grid
Free Proposal Access
Space
Constraints
Maximize every megawatt of compute
Free Proposal Access
Fluctuating
Workloads
Are millisecond-scale load spikes putting uptime at risk?
Free Proposal Access
Increasing
Energy Losses
Is high-performance computing cooling driving up your PUE?
Free Proposal Access
Stricter Environmental
Compliance
Compliance without compromise
Free Proposal Access
  • Power
    Constraints
  • Extended
    Deployment Cycles
  • Space
    Constraints
  • Fluctuating
    Workloads
  • Increasing
    Energy Losses
  • Stricter Environmental
    Compliance
Why Choose Jereh's Integrated Microgrid Solution
A
Agile
E
Highly Efficient
C
Comprehensive Collaboration
Over 98%
Overall Efficiency
Saving 30%
Footprint
Data Centers Power Architecture
800V HVDC Architecture
UPS Architecture
800V HVDC Architecture
UPS Architecture
100MW-class Integrated Power Supply Project for Data Centers
Application Case
100MW-class Integrated Power Supply Project for Data Centers
Learn More
  • US
    US
    Location
  • Top CSP
    Top CSP
    Client
  • 6 months
    6 months
    Duration
  • Power Gensets + BESS + PDU
    Power Gensets + BESS + PDU
    Scope
Client Voices

Jereh's microgrid solution helped us bypass lengthy grid approval processes, significantly shortening our time to market. We brought our high-value AI compute online and generated revenue a full six months ahead of schedule.

Project Manager<br> Leading Global CSP
Project Manager
Leading Global CSP
FAQ
Why are gas turbine gensets the optimal choice for AIDC at this stage?

1) Compared with gas reciprocating units, gas turbines feature higher single-unit power, smaller footprint, longer service life, stable performance, lower O&M costs and lower total cost of ownership.

2) Our self-developed modular gas turbines can be installed and commissioned on-site within 8 hours, greatly cutting construction time and reducing labor and site costs.

Value of energy storage in AIDC

1) Stabilize drastic computing load fluctuations and optimize operating conditions to extend the service life of gas turbines.

2) Work with the 800V HVDC architecture to temporarily carry data center loads, reduce fuel consumption and cut operational costs.

3) Support peak-valley arbitrage and grid frequency regulation when connected to public grids, creating additional revenue streams.

4) Provide seamless emergency power supply during generator faults, leaving sufficient time for unit startup and on-site maintenance to avoid computing service interruptions.

Applicable energy storage types for data centers

1) Supercapacitor Energy Storage: Response time ≤10ms, ideal for instantaneous high-power fluctuation suppression.

2) Flywheel Energy Storage: Response time 20-30ms, for short-term rapid power support.

3) Electrochemical Energy Storage: Response time ≤60ms, offering large-capacity long-duration energy storage. Combined with SST and 800V HVDC systems, it enables integrated networking of multiple storage forms for a highly reliable smart microgrid.

Still have questions?Our engineering experts are here to help, Contact Us.
Get Your Customized Solution
Contact Us
官方领英 意见反馈